Challenges and Solutions in the Construction of the Hong Kong-Zhuhai-Macao Bridge Immersed Tunnel

Authors

  • Yubai Li

DOI:

https://doi.org/10.62051/w5rdcb24

Keywords:

Hong Kong-Zhuhai-Macao Bridge; Immersed Tunnel; Construction Challenges; Civil Engineering

Abstract

This research aims to systematically analyze the design and construction challenges encountered during the development of the Hong Kong-Zhuhai-Macao Bridge (HZMB) immersed tunnel. By thoroughly examining these challenges, the study seeks to generate valuable insights that can inform future infrastructure projects of similar scale and complexity. A comprehensive understanding of the design principles employed, construction techniques implemented, and risk mitigation strategies utilized throughout the HZMB project will enhance the safety, reliability, and efficiency of immersed tunnel construction. Furthermore, the findings of this research have the potential to stimulate innovation in immersed tunnel technology, leading to the development of more advanced engineering solutions that prioritize sustainability. By addressing the unique complexities associated with immersed tunnels, this research not only contributes to the body of knowledge within civil engineering but also serves as a guide for practitioners and researchers aiming to push the boundaries of infrastructure development. Ultimately, this paper aspires to support the advancement of civil engineering practices, ensuring that future projects are better equipped to meet the demands of modern infrastructure needs.

Downloads

Download data is not yet available.

References

[1] C. Du, Q.H. Gao, S.A. Song, Seismic response analysis of immersed tunnel of Hong Kong Zhuhai-Macao Bridge under oblique seismic waves, Journal of Hebei University of Technology 53.03 (2024) 76-86.

[2] Z.N. Hu, Y.L. Xie, J. Wang, Challenges and strategies involved in designing and constructing a 6 km immersed tunnel: A case study of the Hong Kong–Zhuhai–Macao Bridge. Tunnel. Undergr. Space Technol. 50 (2015) 171–177.

[3] Y.P. Liu, X.W. Xu, H.B. Wei, J.W. Song, Loading test technology in deep water for Hong Kong-Zhuhai-Macao Bridge, Rock and Soil Mechanics 39.S2 (2018) 480-485.

[4] M. Lin, W, Lin, H.Q. Yin, X.D. Liu, K.X. Liu, Memory bearing-problem solutions of immersed tunnel immersion joint differential settlement, China Harbour Engineering 38.06 (2018) 1-8.

[5] D.W. Guo, W.K. Zheng, Settlement analysis research on immersed tunnel of Hong Kong-Zhuhai-Macao Bridge, Shanxi Architecture 38.16 (2012) 212-214.

Downloads

Published

20-12-2024

How to Cite

Li, Y. (2024). Challenges and Solutions in the Construction of the Hong Kong-Zhuhai-Macao Bridge Immersed Tunnel. Transactions on Engineering and Technology Research, 4, 225-230. https://doi.org/10.62051/w5rdcb24