Shang, N. (2026) “Multi-dimensional Manufacturing Resources of Workstations and Workers are Collaboratively Optimized for Dynamic Scheduling Technology”, International Journal of Mechanical and Electrical Engineering, 8(1), pp. 80–89. doi:10.62051/ijmee.v8n1.09.